JURY REPORT

Jury Report NEW!

QUESTIONS AND ANSWERS

Questions and answers UPDATED! (1.4 mb, .pdf)
1. Clerical error corrected.

 

DOCUMENTS PROVIDED

Specification UPDATED! (1.3 mb, .pdf)
Changes to the previous version:
1. “Chapter 21- PROCEDURES AND PRINCIPLES FOR THE CONSTRUCTION OF THE 1ST PRIZE WINNING PROJECT” is added.
2. Registration fee explanation is corrected.

The Competition Book UPDATED! (105 mb, .pdf)
Changes to the previous version:
1. Additional explanations to functional programme is added.
2. The location of the planned port is added.
3. The listed buildings are corrected.

Approved plans: Environmental Plan (1:25.000), Master Plan (1:5.000), Development Plan (1:1000) (139 mb, zipped .jpegs)

Basemap UPDATED! (15 mb, .dwg)
Changes to the previous version:
1. The listed buildings are corrected.
2. Elevations on isohip lines are added.

Geological report (1.3 mb, .pdf)

Photos (2 gb, .zip)

3D site model (12 mb, zipped .3dm and .dxf)

Official document of participation UPDATED! (37 kb, .pdf)
Changes to the previous version:
1. Clerical error corrected.

 

LINKS

Investment Support and Promotion Agency of Turkey

Balikesir Metropolitan Municipality (Turkish only)

Public Procurement Law

Regulations for Competitions

Turkish Central Bank (For the exchange rates)

IDO (If you are in Istanbul, the simplest way to reach the site)

Turkey Home (If you finish your architectural tasks and want to be a regular tourist)